Alright, we got a little sidetracked this summer and haven’t made any progress on the project other than changing things up a bit and acquiring some parts. I started going through some stuff to help freshen my memory.
We got the rotating assembly back all rebalanced and should start assembling in a week or two.
Eagle crank, Summit rods, DSS Racing pistons, Summit gas ported rings, Scat flex plate, Summit dampener, Clevite main and rod bearings and ARP main bolts.
You must be registered for see images attach